Blade inspections wind farm Wachtebeke.

Skip to main content Skip to navigation
  • About Storm
  • Our wind farms
  • Resident participation
  • News
  • Contact us
Operational
  • Berlare
  • Courrière
  • Desselgem
  • Dilsen-Stokkem
  • Geel
  • Genk
  • Gent Honda
  • Geraardsbergen
  • Haven Gent
  • Haven Gent Phase 2
  • Haven Gent Phase 3a
  • Haven Gent Phase 3b
  • Lokeren
  • Maasmechelen
  • Meer
  • Meer Zuid
  • Melsele
  • Minderhout
  • Pelt
  • Retie
  • Wachtebeke
  • Westerlo
  • Wielsbeke
  • Zandvliet
  • Zoersel
Under construction
  • Umicore Olen
In procedure
  • A11 Knokke-Heist
  • Aalter-Deinze
  • Assenede
  • Bernimont
  • Beveren-Zuid
  • Biesmérée
  • Bra
  • Brecht-Hoekakker
  • Dinez-Fontenaille
  • E40
  • Evergem
  • Geel-Oosterlo
  • Gembloux
  • Habay
  • Houyet
  • Léglise
  • Lokeren 2
  • Mabompré
  • Mabompré-Nord
  • Meer-West
  • Mollem
  • Mourcourt
  • Nassogne
  • Oud Turnhout
  • Quévy
  • Remichampagne
  • Remichampagne deuxième ligne
  • Rumillies
  • Sint-Gillis-Waas
  • Stekene
  • Tilly
  • Tongeren-Vreren
  • Vorselaar-Lille
  • Wolvertem
  • Xhoût si-Ploût
  • Zele-Lokerenbeek
BeENEnglish
BeBelgium
  • nlNederlands
  • enEnglish
  • frFrançais
IeIreland
  • enEnglish
  • gaGaeilge

You are here

Home Wind farms Wind farm Wachtebeke News Blade inspections wind farm Wachtebeke.

Blade inspections wind farm Wachtebeke.

Wind farm Wachtebeke
14 Sep 2014

To ensure optimum energy production of a wind farm, regular maintenance and inspections have to take place, such as inspecting the blades of a wind turbine annually for damage and defects. This month the blades of the wind turbines in Wachtebeke were thoroughly inspected.

Not a profession for people who are afraid of heights...

Full size
Share this on:
Facebook Twitter LinkedIn

Wind farm Wachtebeke

Operational

The Storm wind farm in Wachtebeke is part of Storm's first repowering project. The original turbines in Wachtebeke were replaced in 2023 with two larger and more efficient models. The wind farm is now operating at full capacity, producing approximately 30,632 MWh per year. This is enough renewable energy to power over 8,700 households annually. For comparison, the two original wind turbines had a capacity of 2.5 MW and generated electricity for about 3,700 households per year.

2
Number of turbines
230m
Tip height

Related news

Sunny open site day at Storm Wind Farm Wachtebeke. Wind farm Wachtebeke 18 Sep 2023
Repowering work begins at Wachtebeke Wind Farm Wind farm Wachtebeke 24 Mar 2023
176 local residents participate in the first Storm wind farm. Wind farm Wachtebeke 9 Dec 2013
  • About Storm
  • Our wind farms
  • Resident participation
  • News
  • Contact us

Newsletter

Register for our 3-monthly newsletter and stay up to date of the latest developments.

Follow us:
Facebook Instagram Linkedin

Contact

+32 3 210 07 20
info@storm.be
© Storm 2025 – Privacy & disclaimer
Investing in shares involves risks, including the risk to partially or fully lose the invested amount.
Site made by Wieni