
Wind farm Aalter-Deinze
In Procedure
The Storm wind farm Aalter-Deinze is planned alongside the highway E40. Once operational, the wind farm will produce enough green energy to meet the annual consumption of 7.160 families.
The Storm wind farm Aalter-Deinze is planned alongside the highway E40. Once operational, the wind farm will produce enough green energy to meet the annual consumption of 7.160 families.