Open Site wind farm Meer.

Skip to main content Skip to navigation
  • About Storm
  • Our wind farms
  • Resident participation
  • News
  • Contact us
Operational
  • Berlare
  • Courrière
  • Desselgem
  • Dilsen-Stokkem
  • Geel
  • Genk
  • Gent Honda
  • Geraardsbergen
  • Haven Gent
  • Haven Gent Phase 2
  • Haven Gent Phase 3a
  • Haven Gent Phase 3b
  • Lokeren
  • Maasmechelen
  • Meer
  • Meer Zuid
  • Melsele
  • Minderhout
  • Pelt
  • Retie
  • Wachtebeke
  • Westerlo
  • Wielsbeke
  • Zandvliet
  • Zoersel
Under construction
  • Umicore Olen
In procedure
  • A11 Knokke-Heist
  • Aalter-Deinze
  • Assenede
  • Bernimont
  • Beveren-Zuid
  • Biesmérée
  • Bra
  • Brecht-Hoekakker
  • Dinez-Fontenaille
  • E40
  • Evergem
  • Geel-Oosterlo
  • Gembloux
  • Habay
  • Houyet
  • Léglise
  • Lokeren 2
  • Mabompré
  • Mabompré-Nord
  • Meer-West
  • Mollem
  • Mourcourt
  • Nassogne
  • Oud Turnhout
  • Quévy
  • Remichampagne
  • Remichampagne deuxième ligne
  • Rumillies
  • Sint-Gillis-Waas
  • Stekene
  • Tilly
  • Tongeren-Vreren
  • Vorselaar-Lille
  • Wolvertem
  • Xhoût si-Ploût
  • Zele-Lokerenbeek
BeENEnglish
BeBelgium
  • nlNederlands
  • enEnglish
  • frFrançais
IeIreland
  • enEnglish
  • gaGaeilge

You are here

Home Wind farms Wind farm Meer News Open Site wind farm Meer.

Open Site wind farm Meer.

Wind farm Meer
12 Jul 2015

On July 12, 2015, we invited local residents and other interested parties to visit the site of the Storm wind farm in Meer.

The middle turbine presented visitors with more information about the wind turbines and snacks and drinks were provided. The visitors were particularly impressed by the several metres long blades that lay at the foot of wind turbine 3, ready to be mounted.

It was a great day with lots of ice cream, windmills and expert explanations.

Full size
Full size
Full size
Full size
Previous Next
Share this on:
Facebook Twitter LinkedIn

Wind farm Meer

Operational

The Storm wind farm in Meer (in Hoogstraten) is just a stone’s throw from the Transport Zone on the E19 motorway. The wind farm has been operational since the end of 2015. The turbines produce renewable energy for a grand total of 10.200 families! 160 local residents in Hoogstraten and Zundert (in the Netherlands) have pledged their support to the Storm CV co-op.

3
Number of turbines
200m
Tip height

Related news

Replacing the gearbox at the Wind farm in Meer. Wind farm Meer 23 Aug 2018
Minister Turtelboom inaugurates the highest wind farm in the country. Wind farm Meer 5 Feb 2016
160 residents participate in wind farm Meer. Wind farm Meer 31 Oct 2015
  • About Storm
  • Our wind farms
  • Resident participation
  • News
  • Contact us

Newsletter

Register for our 3-monthly newsletter and stay up to date of the latest developments.

Follow us:
Facebook Instagram Linkedin

Contact

+32 3 210 07 20
info@storm.be
© Storm 2025 – Privacy & disclaimer
Investing in shares involves risks, including the risk to partially or fully lose the invested amount.
Site made by Wieni