Local residents check out the site in Maasmechelen on the Open Day.

Skip to main content Skip to navigation
  • About Storm
  • Our wind farms
  • Resident participation
  • News
  • Contact us
Operational
  • Berlare
  • Courrière
  • Desselgem
  • Dilsen-Stokkem
  • Geel
  • Genk
  • Gent Honda
  • Geraardsbergen
  • Haven Gent
  • Haven Gent Phase 2
  • Haven Gent Phase 3a
  • Haven Gent Phase 3b
  • Lokeren
  • Maasmechelen
  • Meer
  • Meer Zuid
  • Melsele
  • Minderhout
  • Pelt
  • Retie
  • Wachtebeke
  • Westerlo
  • Wielsbeke
  • Zandvliet
  • Zoersel
Under construction
  • Umicore Olen
In procedure
  • A11 Knokke-Heist
  • Aalter-Deinze
  • Assenede
  • Bernimont
  • Beveren-Zuid
  • Biesmérée
  • Bra
  • Brecht-Hoekakker
  • Dinez-Fontenaille
  • E40
  • Evergem
  • Geel-Oosterlo
  • Gembloux
  • Habay
  • Houyet
  • Léglise
  • Lokeren 2
  • Mabompré
  • Mabompré-Nord
  • Meer-West
  • Mollem
  • Mourcourt
  • Nassogne
  • Oud Turnhout
  • Quévy
  • Remichampagne
  • Remichampagne deuxième ligne
  • Rumillies
  • Sint-Gillis-Waas
  • Stekene
  • Tilly
  • Tongeren-Vreren
  • Vorselaar-Lille
  • Wolvertem
  • Xhoût si-Ploût
  • Zele-Lokerenbeek
BeENEnglish
BeBelgium
  • nlNederlands
  • enEnglish
  • frFrançais
IeIreland
  • enEnglish
  • gaGaeilge

You are here

Home Wind farms Wind farm Maasmechelen News Local residents check out the site in Maasmechelen on the Open Day.

Local residents check out the site in Maasmechelen on the Open Day.

Wind farm Maasmechelen
9 Jan 2014

There were many interested local residents at the Open Site in Maasmechelen last Sunday. Despite the cold weather, there were still quite a few interested people to check out the turbine components.

A number of Storm employees were on site to answer the many visitor questions.

The wind farm is almost ready. We are now waiting for a calm moment so that the second rotor can be lifted into place.

Full size
Full size
Full size
Full size
Full size
Previous Next
Share this on:
Facebook Twitter LinkedIn

Wind farm Maasmechelen

Operational

The Storm wind park in Maasmechelen (in the province of Limburg) is located adjacent to highway E314. This particular wind farm produces 10.500 MWh per year, enough for the annual usage of about 3.000 families. The number of participants in the Storm CVBA cooperative? 121 locals!

2
Number of turbines
150m
Tip height

Related news

Beautiful winter scenery of wind farm Maasmechelen. Wind farm Maasmechelen 18 Feb 2015
Storm CVBA welcomes 315 new cooperants for the wind farms in Maasmechelen and Westerlo. Wind farm Maasmechelen 24 Jun 2014
The first wind turbine in Maasmechelen has been finalised! Wind farm Maasmechelen 15 Jan 2014
  • About Storm
  • Our wind farms
  • Resident participation
  • News
  • Contact us

Newsletter

Register for our 3-monthly newsletter and stay up to date of the latest developments.

Follow us:
Facebook Instagram Linkedin

Contact

+32 3 210 07 20
info@storm.be
© Storm 2025 – Privacy & disclaimer
Investing in shares involves risks, including the risk to partially or fully lose the invested amount.
Site made by Wieni