Piling activities have started in Lokeren.

Skip to main content Skip to navigation
  • About Storm
  • Our wind farms
  • Resident participation
  • News
  • Contact us
Operational
  • Berlare
  • Courrière
  • Desselgem
  • Dilsen-Stokkem
  • Geel
  • Genk
  • Gent Honda
  • Geraardsbergen
  • Haven Gent
  • Haven Gent Phase 2
  • Haven Gent Phase 3a
  • Haven Gent Phase 3b
  • Lokeren
  • Maasmechelen
  • Meer
  • Meer Zuid
  • Melsele
  • Minderhout
  • Pelt
  • Retie
  • Wachtebeke
  • Westerlo
  • Wielsbeke
  • Zandvliet
  • Zoersel
Under construction
  • Umicore Olen
In procedure
  • A11 Knokke-Heist
  • Aalter-Deinze
  • Assenede
  • Bernimont
  • Beveren-Zuid
  • Biesmérée
  • Bra
  • Brecht-Hoekakker
  • Dinez-Fontenaille
  • E40
  • Evergem
  • Geel-Oosterlo
  • Gembloux
  • Habay
  • Houyet
  • Léglise
  • Lokeren 2
  • Mabompré
  • Mabompré-Nord
  • Meer-West
  • Mollem
  • Mourcourt
  • Nassogne
  • Oud Turnhout
  • Quévy
  • Remichampagne
  • Remichampagne deuxième ligne
  • Rumillies
  • Sint-Gillis-Waas
  • Stekene
  • Tilly
  • Tongeren-Vreren
  • Vorselaar-Lille
  • Wolvertem
  • Xhoût si-Ploût
  • Zele-Lokerenbeek
BeENEnglish
BeBelgium
  • nlNederlands
  • enEnglish
  • frFrançais
IeIreland
  • enEnglish
  • gaGaeilge

You are here

Home Wind farms Wind farm Lokeren News Piling activities have started in Lokeren.

Piling activities have started in Lokeren.

Wind farm Lokeren
8 Sep 2016

The construction of the foundation has started at the site of the wind farm. Piles are being knocked into the ground with a large pile driver.

A spectacular process.

Full size
Full size
Full size
Previous Next
Share this on:
Facebook Twitter LinkedIn

Wind farm Lokeren

Operational

The wind farm in Lokeren in the province of East Flanders is just North of the E17 highway near the town of Heiende. This particular wind farm has been operational since the start of 2017, providing renewable energy for approximately 5.500 families. 263 local residents of Lokeren, Zele, Lochristi and Berlare have signed up for the Storm CV cooperative.

4
Number of turbines
150m
Tip height

Related news

Minister Tommelein officially inaugurates the wind farm in Lokeren together with young cooperants. Wind farm Lokeren 6 Jul 2017
The rotor of wind turbine 3 In Lokeren is lifted in place. Wind farm Lokeren 22 Feb 2017
Open Day at Wind Farm Lokeren. Wind farm Lokeren 22 Feb 2017
  • About Storm
  • Our wind farms
  • Resident participation
  • News
  • Contact us

Newsletter

Register for our 3-monthly newsletter and stay up to date of the latest developments.

Follow us:
Facebook Instagram Linkedin

Contact

+32 3 210 07 20
info@storm.be
© Storm 2025 – Privacy & disclaimer
Investing in shares involves risks, including the risk to partially or fully lose the invested amount.
Site made by Wieni